Time has flown by and the crew has been working super hard maintaining our trails and providing defensible space near structures for the last 13 weeks! This crew has been a reliable and crucial resource for trail maintenance this summer. They have learned quickly and perform to a high standard on the trail. Running a weedwhip for hours is not an easy feat, but the crew has an amazing attitude and provide lots of laughs during our breaks.
Major trail accomplishments include:
-
Brushed ~1.6 mi from the parking lot to Sandstone Peak
-
Brushed ~2.6 mi in Solstice, with more on the radar (includes some of the SC Trail, Rising Sun, TRW Loop, entrance road from gate, & parking lot)
-
Brushed the ~1.2 mi Grotto Trail & CX campground
-
Brushed the ~1.5 mi CX Canyon View Trail
-
Brushed ~2 miles of BBT from Mishe Mokwa parking lot to Triunfo Peak and ~1.4 mi in Corral Canyon
-
Hand tool trail work which includes redefining dip drains, addressing washouts, and tread repair on the Zuma Loop Trail and ZC Canyon View Trail
-
~20 trashbags of litter collected from the sites we have visited!




